GRANT PUD GETS NEW SHAFT FOR WANAPUM DAM TURBINE REPLACEMENT

A 22-foot long shaft destined to be the fourth turbine replacement at Wanapum Dam — nearly 80 tons of cylindrical steel –rolled down central Washington’s highway 243 on a truck with 54 wheels early this month.

Read the full article…

Become a Member and get unlimited access to all articles.

Register

Already a member? Log in here
© Copyright 1997- 2026 Columbia Basin Bulletin. All rights reserved.