AS PLANNED, HIGH RIVER FLOWS BREACH SANDY RIVER’S COFFER DAM
Mother Nature triggered the last phase of the Marmot Dam removal on the Sandy River last Friday (Oct. 19). As anticipated, the first high- river flows of the season breached the earthen coffer dam that held back water during Portland General Electric’s demolition activities at the site.